  1. Top1Anlage 100000000015288
    FGD - plant
    Power station
    Germany

    longitudinal stockyard
    refurbishing
    1x portal scraper KP1200.42

    FGD - gypsum 1200 t/h
  2. Top2Anlage 99999999997987
    Coaling installation
    Power station
    Germany

    longitudinal stockyard
    stockyard capacity 82700 t,
    refurbishing, extension bucket wheel boom
    2x stacker-reclaimer STR3000/1800.37C

    coal 3000 / 1800 t/h
  3. Top3Anlage 99999999998753
    Coaling installation
    Power station
    Germany

    conveying system
    refurbishing chute system and screen

    hard coal 300 t/h
  4. Top4Anlage 99999999998774
    Ash handling plant
    Coaling installation
    Power station
    Kosovo

    conveying system
    refurbishing coal and ash installations

    coal 750 t/h
    fly ash
  5. Top5Anlage 99999999998686
    Coaling installation
    Power station
    Germany

    opencast mining system
    refurbishing complete mechanical and
    electrical service for
    2x bucket wheel reclaimer RE1800.41SW

    coal 1800 t/h
  6. Top6Anlage 99999999999117
    Ash handling plant
    Coaling installation
    Power station
    Kosovo

    conveying system
    mill coaling plant with wet ash removal, refurbishing
    8x chain conveyor - drag bar feeder
    1x scraper conveyor

    wet ash, coal 1000 t/h
  7. Top7Anlage 99999999999118
    Ash handling plant
    Power station
    Kosovo

    conveying system
    refurbishing conveyor system, belt width 800 mm with 4 km total length

    fly ash 120 t/h